Erosion of the Slopes of Gold Tailings Dams
A study has been made of rates of erosion from the slopes of gold-residue dams in the South African Highveld region. Data is available for two years at this time and conclusions must therefore...

Use of Geomembranes in Deep Valley Landfills
The installation of geomembranes (synthetic liners) under deep valley landfills of utility and mine waste presents unique problems. Limited data are available concerning geomembranes beneath...

Environmental Geotechnology & Tailings Reclamation
The Department of Energy is responsible, in terms of Federal Legislation, for remedial action work at 24 inactive uranium mill tailings piles in ten states. This paper describes the setting...

Reclamation of Athabasca Oil Sand Sludge
The bulk of oil sand tailings (80 to 90%) consists of quartz sand, which is defined to be everything coarser than 44 microns. The other 10 to 20%, termed 'sludge',...

Thickened Slurry Disposal Method for Process Tailings
Common practice in the disposal of process tailings consists of impounding the wastes as thin slurries or suspensions in diked containment areas. Such a procedure poses problems relating...

Computer Scheduling: On-Line and On-Time
The Intermountain Power Plant, a coal fired, 761 MW coal fired electrica generating facility, has been completed months ahead of schedule and substantially under budget. Project managers...

Modeling Coal Pile Leachate - A Case Study
Ground water transport of coal leachate from an existing unlined coal storage pile was modeled using the USGS 'Computer Model of Two-Dimensional Solute Transport and Dispersion...

Bright Lights Over China
The financing for Guangdong province's newest 700 mw coal fired electric power station came from a syndicate of 46 banks from 11 countries. The steel for the turbine generators...

An Economical Approach to Receiving Coal by Rail in the Sub-Arctic Environment
During the period 1983 to early 1985 a multimillion dollar coal transfer facility was designed and constructed in Seward, Alaska. The facility transfers coal from rail cars to temporary...

Coal Mining in Alaska's Interior: Problems and Solutions
The Usibelli Coal Mine located in Healy, Alaska is currently the largest operating coal mine in the state of Alaska. The mine has recently increased production to nearly 1. 7 million tons...

Geotechnical investigation: Cominco's Red Dog Mine Facilities
The siting of major facilities associated with development of the Red Dog Mine Complex in Northwestern Alaska on relatively warm permafrost soil and rock presented geotechnical engineers...

Design and Construction of Marine Facilities for Ridley Island Coal Terminal
The design and construction of the wharf for 250,000 DWT bulk carriers is discussed in this paper. The terminal project was carried out on fast-track, 23 month schedule, with construction...

Expansion of the Electro-Coal Transfer Terminal
This paper briefly describes renovation and expansion of the coal and phosphate marine terminal in Davant, La. The program included: replacement of existing berths damaged by marine accident;...

Liquefaction Study of Coal Refuse by Nuclear Gauges
This paper presents a technique for utilizing nuclear gauges to determine density and moisture content continuously throughout refuse embankments and slurry reservoirs. The nuclear measurements...

Cone Penetrometer Use on Uranium Mill Tailings
Piezocone data were found to be very reliable in the identification of uranium tailings according to the traditional categories of sands, sand-slime mixtures, and slimes by the use of...

Trace Toxic Metals Emissions from Hazardous Waste Incinerators
A physical model is proposed in order to explain the vaporization of metals during metallic waste incineration and is based on work performed to investigate inorganic emissions from coal...

Leaching Characteristics of Metal Finishing Sludges
The purpose of this research was to study the feasibility of biodegrading phenolics to methane by thermophilic anaerobic treatment. The study was a feasibility level assessment which examined...

Future Hydrothermal Power of the United States
Public indignation toward nuclear-power expansion, and dwindling oil and gas reserves dictate the needs to look for alternative-power sources, such as coal and water. It is a prime time...

Behavior of Sediment-Laden Plumes on Steep Slopes
The near field behavior of dense, sediment-laden flows on steep slopes was investigated as part of a study of mine tailings disposal. A literature review indicated that field and laboratory...

New Generation Capacity
Currently, electric utilities in the U. S. have excess generation capacity. In addition, some new generation capacity is well under construction and is scheduled to come on-line soon,...

 

 

 

 